top of page

Preferred Schematic Report

The Preferred Schematic Report (PSR) is the second stage of the Feasibility Study phase, where the District and its team collaborate to refine their educational program and space summary, further develop and evaluate alternatives, and recommend the most cost-effective and educationally appropriate solution.

PSR Cost Estimate

** Please note the cost estimate is for construction cost only.  Refer to slide presented to the School Building Committee meeting on March 13, 2025, for Total Project Cost including construction cost, escalation, soft cost and owner contingency.

1. Introduction

2. Evaluation of Existing Conditions

3. Final Evaluation of Alternatives

4. Preferred Solution

5. Local Actions and Approvals

A. Appendix

PSR Summary Image.png
DW Logo - Color_Combined Logo.png

© 2024  Burlington School District

bottom of page